3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time, outdoor temperature
and outdoor heat exchanger temperature as follows.
1st defrost
Compressor
integrating
operation:
Over 22 min.
Outdoor
heat exchanger
temperature:
Below - 9°C
AMP Air Conditioning
Heating operation start : Compressor ON
2nd and later defrost
Compressor
Compressor
integrating
integrating
operation:
operation:
Over 35 min.
Over 62 min.
Outdoor
Tn-Tn10 < - 5deg
heat exchanger
Tn-Tnb < - 2deg
temperature:
However, Tn < - 6 °C
Below - 5°C
Defrost start
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Outdoor heat exchanger temperature:
Over +13°C
Compressor ON time: Maximum 15 minutes
Defrost end
(Not defrosted for 10 minutes)
Compressor
OFF count :
40 times
(Less than 10min.)
=
Compressor OFF
Outdoor fan motor OFF
30 sec later four - way valve OFF
35 sec later compressor ON
or
01-18
www.ampair.co.uk | sales@ampair.co.uk
Integrating defrost
(Constant monitoring)
Compressor
Compressor
integrating
integrating
operation:
operation:
Over 240 min.
Over 215 min.
Outdoor
Outdoor
heat exchanger
heat exchanger
temperature:
temperature:
Below - 3°C
Below - 5°C