Hardware Installation
19
6. Carefully hand tighten the gland into Gigabit port GE1. Once the gland is snug, use
a 24 mm socket and finishing tighten the gland.
If the node is going to be configured as a Mesh Point Root node (Mesh Point Root nodes
have a direct wired Ethernet connection to the core network or an Ethernet connection to a
wireless backhaul) a cable gland will be required for Gigabit Ethernet port GE1.