Checking That Music Was Performed Correctly - Ricoh PE-P4 Field Service Manual

Hide thumbs Also See for PE-P4:
Table of Contents

Advertisement

4. Replacement and Adjustment

Checking that MUSIC was Performed Correctly

Four sets of vertical lines appear on the test chart (C and k, M and k, Y and k...). In each set, look for
vertical lines that are aligned within the region defined by "OK".
If all sets have at least one set of vertical lines that are aligned [A], MUSIC was successful.
128

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M199M204Mf4M200M203

Table of Contents