Switch - Cisco IE 4000 Hardware Installation Manual

Hide thumbs Also See for IE 4000:
Table of Contents

Advertisement

Switch Installation
Installing the Switch
Figure 14
Position the Hooks Over the DIN Rail
1
DIN Rail
3.
Push the switch toward the DIN rail to cause the spring-loaded latch at the bottom rear of the switch to move down,
and snap into place.
After the switch is mounted on the DIN rail, connect the power and alarm wires, as described in
Circuits, page
31.
For configuration instructions about the CLI setup program, see
Program, page
45.
Note:
For instructions on how to remove the switch from a DIN rail, see
Removing the Switch from a DIN Rail
To remove the switch from a DIN rail, follow these steps:
1.
Ensure that power is removed from the switch, and disconnect all cables and connectors from the front panel of the

switch.

2.
Insert a tool such as a flathead screwdriver in the slot at the bottom of the spring-loaded latch and use it to release
the latch from the DIN rail. See
3.
Pull the bottom of the switch away from the DIN rail, and lift the hooks off the top of the DIN rail. See
page
31.
1
Figure 15 on page
2
2
Switch
Configuring the Switch with the CLI-Based Setup
Removing the Switch from a DIN Rail, page
31.
30
Connecting Alarm
30.
Figure 15 on

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents