Installing The Devicenet Unit; System Configuration Precautions; Mounting - Omron CJ1W-DRM21 Operation Manual

Machine automation controller cj-series, nj-series cpu unit
Hide thumbs Also See for CJ1W-DRM21:
Table of Contents

Advertisement

2-2

Installing the DeviceNet Unit

2-2-1

System Configuration Precautions

You can mount up to 16 Units on the CPU Rack or an Expansion Rack per CPU (but no more than
10 Units on one Rack).
2-2-2

Mounting

1
Carefully align the connectors to mount the DeviceNet Unit.
2
Move the yellow sliders on the top and bottom of the Unit until they click into position, to lock.
Precautions for Safe Use
If the sliders are not securely locked, the DeviceNet Unit functions may not operate sufficiently.
To dismount the Unit, move the sliders to the "Release" direction.
CJ-series DeviceNet Units Operation Manual for NJ-series CPU Unit(W497)
2 Nomenclature and Installation
Hooks
Openings for hooks
Connector
Slide latches back until they lock.
(The latches will click when they lock.)
Lock
Release
Slider
2
2-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents