Procedure Before Starting The Operation - Mitsubishi Electric MELSECSystem Q User Manual

Q64tctt;q64tcttbw; q64tcrt;q64tcrtbw
Table of Contents

Advertisement

4 SETUP AND PROCEDURE BEFORE STARTING THE OPERATION

4.2 Procedure Before Starting the Operation

Module mounting
Mount the Q64TC in the specified slot.
Wiring
Wire the Q64TC.
Intelligent function module switch setting
Perform settings using the GX Developer
(see Section 4.5)
4
Execution of auto tuning
Perform auto tuning to set PID constants.
Initial setting
Using the FROM/TO commands, create
a sequence program for writing initial values.
Programming
Create and check a program using the
FROM/TO commands.
Warmup operation
(when Q64TCTT(BW) is used)
Perform warmup operation about 15
minutes before starting operation.
4 - 2
The figure below shows the steps that should be followed before starting the Q64TC
operation.
Start
Use the GX Configurator-TC?
No
Operation
POINT
When using the Q64TCTT(BW) which uses a thermocouple as a temperature
sensor, perform warmup operation about 15 minutes before starting operation to
make temperature compensation properly.
Yes
Initial setting
Perform the initial setting using the GX
Configurator-TC (see Section 5.4).
Perform automatic
No
refresh setting?
Automatic refresh setting
Perform the automatic refresh setting using
the GX Configurator-TC (see Section 5.5).
Programming
Create and check a program without using the
FROM/TO commands.
MELSEC-Q
Yes
4 - 2