Primary Boom Components; Cable Track; How To Repair The Primary Boom Cable Track; Primary Boom - Genie Z-30/20N Service And Repair Manual

Lift capacity 500 lbs
Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

September 2015

Primar y Bo om Co mpon ents
4-1
4-1 C able Track

Cable Track

The primary boom cable track guides the cables
and hoses running up the boom. It can be repaired
link by link without removing the cables and hoses
that run through it. Removing the entire primary
boom cable track is only necessary when
performing major repairs that involve removing the

primary boom.

Part No. 1268498
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N

Primary Boom Components

How to Repair the Primary Boom
How to R epair the Primary Boom C abl e Tr ack
Cable Track
Component damage hazard.
The boom cable track can be
damaged if it is twisted.
Note: A 7 link repair section of cable track is
available through the Genie Service Parts
Department.
1 link separation point
2 lower clip
1
Use a slotted screwdriver to pry down on the
lower clip.
2
To remove a single link, open the lower clip
and then use a screw driver to pry the link to
the side.
3
Repeat steps 1 and 2 for each link.
Service and Repair Manual
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-34/22nZ-30/20n rjZ-34/22dc

Table of Contents