Note: Use The Following Chart To Identify The Description Of Each Lcd Screen Control Button Used In This Procedure - Genie ZX-135/70 Service And Repair Manual

Hide thumbs Also See for ZX-135/70:
Table of Contents

Advertisement

October 2016
Note: Use the following chart to identify the
description of each LCD screen control button used
in this procedure.
Plus
Minus
Digital levels with alternate zero function:
Note: Prepare the digital level by placing it vertically
on a known surface that is perpendicular to gravity.
Zero out the level with the alternate zero function.
Note: When the level is calibrated correctly, it
should read 0° on a vertical surface.
Digital levels without alternate zero function:
Note: If your digital level does not have an alternate
zero function, it will read 90° on a vertical surface.
During calibration, the measured value will need to
be subtracted from 90 degrees to get the correct
number to enter into the system.
6 Point Calibration procedure
Note: Use this procedure for software versions
before 4.01.
Note: For the 2 Point Calibration procedure,
proceed to step 33.
1
Fully extend the axles with the booms in the
stowed positions.
2
Raise the jib boom to a slightly less than
horizontal position.
3
Push in the ground controls red Emergency
Stop button to the off position. Do not turn the
key switch to the off position.
4
Open the ground control box.
Part No. 1268558
Previous
Enter
ZX-135/70
Jib Boom Components
5
Locate the calibration toggle switch at the top
of the ground control box. Activate calibration
mode by moving the toggle switch in the left
direction.
6
Temporarily install a control box door retaining
fastener between the door and the box to
prevent the control box door from moving the
toggle switch while calibrating the machine.
7
Remove the key from the main key switch.
Insert the key into the bypass/recovery key
switch and turn it to the bypass position.
Note: The angle sensor calibration values will not
be saved correctly unless the key switch is in the
bypass position and the calibration toggle switch is
activated.
8
Press and hold the enter button on the ground
control panel while pulling out the ground
controls red Emergency Stop button to the on
position. Hold the enter button for
approximately 5 seconds and then release it.
9
Enter sensor calibration mode by pressing the
buttons at the ground controls in the following
sequence: (plus)(enter)(enter)(plus).
10 Press the enter or previous button on the
LCD screen until DELETE JIB LEVEL ANGLE
SENSOR CALIBRATION is displayed.
11 Press the plus button to select YES, then
press the enter button to accept.
12 At the jib level calibration deg 60.0deg screen,
start the engine.
Note: If the system exits out of calibration mode
when the engine is started, repeat step 8 and
continue to step 12.
Service and Repair Manual
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-135/70Genie z13505-101Genie z13513-2000

Table of Contents