Takeuchi TCR50 Operator's Manual page 87

Dump carrier
Hide thumbs Also See for TCR50:
Table of Contents

Advertisement

TRANSPORT
Hoisting the Machine
WARNING
� Know and use correct crane signals.
� Inspect the hoisting equipment daily
for damaged or missing parts.
� When hoisting, use a wire rope with
sufficient strength with respect to the
machine's weight.
� Do not hoist with the machine in a
posture other than the one described
in the procedure below. Doing so
is dangerous as it may result in the
machine losing its balance.
� Do not hoist the machine with an
operator (s) on it.
� When hoisting, hoist slowly so that the
machine does not tip.
� Keep all other persons out of the
area when hoisting. Do not move
the machine over the heads of the
persons.
IMPORTANT: This
applles to machines with standard
specifications.
The center of gravity differs according
to the attachments and options that are
mounted.
Consult a Takeuchi sales or service outlet.
Hoisting posture
hoisting
method
Hoisting
1. Lower the dump body all the way down.
2. Align the crawler frame in parallel with the
dump body.
3. Raise the safety lock lever to engage the
lock.
4. Stop the engine and remove the starter
key and get off the machine.
5. Install the sling as shown on the diagram
below.
Suspend in such a way that the sling and
Lifting tool do not touch the body.
6. Set the sling angle to 33° and hoist slowly
until the machine just leaves the ground.
7. Stop hoisting until the machine is stable
and hoist slowly.
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents