E.2 Optional Tower Caster Kit - 90508
T1000 Series UPS Tower Caster Kit Installation Instructions - 94031-000
1. T1000 Tower Caster Kit
The tower configuration modules may be modified with an optional Caster Kit containing a pair of caster
and leveling foot assemblies. Each module requires one Caster Kit.
2. Contents - T1000 Tower Caster Kit (90508)
1 ea.: Tower Caster Kit Installation Instructions - 94031
2 ea.: 91438 - Caster Bracket, Black
2 ea.: 91439 - Connector Plate, Black
2 ea.: Knob, Leveling, 1/4"-20
2 ea.: Leveling Feet, Female
4 ea.: Caster , 2x appliance, 5/16"-18
4 ea.: Nut Cap, 5/16"-18
4 ea.: Washer, Belville, 5/16
7 ea.: Screw PHP (Pan Head Phillips) 10-32 x 1/2
3. Caster Kit Installation
Unpack the T1000 modules and assemble and install the casters as follows.
CASTER ASSEMBLY
1. Insert each caster appliance's threaded shafts through the Caster Bracket. (Figure 1)
2. Place a 5/16" Belville Washer over each caster shaft, then screw on the 5/16"-18 nut cap. Tighten the
nut cap but do not bottom out the washer.
3. Repeat Steps 1-2 for the second caster appliance.
4. Screw the leveling knob through the 1/4"-20 pimnut in the Caster Bracket. (Figure 1, Figure 2)
5. Press the Leveling Foot over the end of the leveling knob shaft. (Figure 2)
6. Repeat Steps 1-5 for the remaining Caster Bracket.
Caster
Appliance
Shaft
Leveling
Knob
Shaft
Appliance
FIGURE 1 CASTER BRACKET
E-2
Caster
Shaft
T1000 Series UPS Installation and Operation Manual – 91074-002
Leveling
Foot
Caster Assembly
mounting screw holes
FIGURE 2 CASTER ASSEMBLY - DETAIL
Leveling Foot
Adjustment
Knob