1900-A2-GN20-00
Step
Procedure
9.)
Secure the power harness in accordance with local office
procedures.
10.)
Turn ON the power to the shelf from the power supply.
STOP
<RX KDYH FRPSOHWHG WKLV WDVN
BitStorm 1900 Installation and Maintenance Guide
2. BitStorm 1900 Installation and Testing
(continued)
2-53