Cascade frame installation
4.2

Installing the insulation

Caution!
First start up the cascade system and test the
system for leaks. Then install the insulation.
Install the rear insulation over the header (fig. 9, item 1).
When an angled low loss header has been installed, fit the
insulation around the bends.
Install the rear insulation part over the low loss header
(fig. 9, item 2).
If required, trim the insulation so that it is straight
(fig. 9, item 3).
For 2½" and 3" low loss header: install the inserts in the
outer insulation. For a 2½" low loss header: install the redu-
cing inserts in the outer recesses (fig. 10, item 2).
For a 3" low loss header: install the reducing inserts in the
inner groves (fig. 10, item 1).
Click the insulation together.
Install the front insulation of the low loss header. If required,
trim the insulation so that it is straight (fig. 9, item 3).
Install the end cover over the header (fig. 9, item 4).
W
• http://www.buderus-commercial.co.uk
10
Installation instructions Logamax plus GB162-80/100 cascade unit • Version 01/2006
4
Fig. 9
Header
1
2
Fig. 10 Inner insulation
We reserve the right to make technical modifications.
1
3
2
1 2

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Gb162-80