15.4 Connections to PLC
Interconnection
Figure 15-4 shows the options for interconnecting the OP and the PLC. Stan-
options
dard cables are available for the connections shown in the figure (refer to the
ST80.1 catalog).
OP
OP5
IF1A
IF2A
OP15
OP 5/A2
IF1B
OP 15/A1,
IF2B
A1-VF, C1
OP 15/A2,
IF2B
A2-VF, C2
1) Any SINEC L2 bus terminal (except FSK)
Figure 15-4 Connection Configuration Scheme for PLCs
15-6
TTY active
TTY active
TTY active
V.24
V.24
TTY passive
TTY/V.24 converter
V.24
V.24/TTY
RS422
RS422/RS485
RS485
RS485
1)
SIMATIC S5
CPU
PU interface
SI 2
CP521 SI
CP523
PC
COM1/2 (9-/25-pin)
SIMATIC TI500/TI505
V.24 (9-/25-pin)
RS422 (9-pin)
Other PLCs
SIMATIC S7
SINEC L2-DP
Manual OP5, OP15