Maintenance
GREASING BEARINGS AND
BUSHINGS (Fig. 22–30)
The machine has grease fittings that must be lubricated
regularly with No. 2 General Purpose Lithium Base
Grease. If the machine is operated under normal condi-
tions, lubricate all bearings and bushings after every 50
hours of operation or immediately after every washing.
1.
The grease fitting locations and quantities are:
Cutting unit carrier frame and pivot (2 ea.)
(Fig. 22); Rear axle tie rod (2), Steering cylinder
ball joints (2), (Fig. 23); Front lift cylinders (2),
(Fig. 24); Front lift cylinder (1), (Fig. 25); Rear lift
cylinder pivot (2), (Fig. 26); Lift arm pivot (3),
(Fig. 27); Rear axle pivot (Fig. 28) Rear lift arm
pivots (2) (Fig. 29) and Brake pedal shaft (1)
(Fig. 30).
26
Figure 22
Figure 23
Figure 24
Figure 25
Figure 26
Figure 27