Installing the Roll Bar

Parts needed for this procedure:
1
Roll bar assembly
4
Flange head bolts
4
Locknuts
1
Hose clamp
Procedure
Important: Never weld or modify a rollover
protection system (ROPS). Replace a damaged
ROPS, do not repair or revise. Any alteration of a
ROPS must be approved by the manufacturer.
1. Lower the roll bar onto the traction unit mounting
brackets, aligning the mounting holes. Ensure that
the vent tube on the roll bar is on the left side of
the machine (Figure 9).
1. ROPS
2. Mounting bracket
3. Vent tube
2. Secure each side of the roll bar to the mounting
brackets with 2 flange head bolts and locknuts
(Figure 9). Torque the fasteners to 60 ft-lb (81 N-m).
3. Secure the fuel line vent hose to the vent tube on the
roll bar with the hose clamp.
You must connect the fuel line vent hose to the
vent tube prior to starting the engine or fuel will
flow from the hose.
Figure 9
4. Fuel line vent tube hose
5. Hose clamp
8

Installing the Front Lift Arms

Parts needed for this procedure:
2
Lift arms
2
Pivot rod
2
Bolt (5/16 x 7/8 inch)
Procedure
1. Remove the 2 bolts that secure the lift arm pivot
shaft link to the lift arm pivot shafts, and remove
and retain the pivot shaft link and bolts (Figure 10).
1. Lift arm, pivot shaft link
2. Insert a pivot rod into each lift arm and align the
mounting holes (Figure 11).
1. Lift arm
3. Secure the pivot rods to the lift arms with 2 bolts
(5/16 x 7/8 inch).
17
Figure 10
2. Lift arm pivot shaft
Figure 11
2. Pivot rod