Si06-305
2. Outdoor Unit
2.1
Removal of
Procedure
Step
1
The
stop valve cover
can be removed when
the fixed screw is
removed.
2
The top plate and the
front plate are
constructed in a
monoblock. Remove
the three screws on the
right side and the two
screws on the front
plate.
Removal Procedure
External Casing
Warning Be sure to turn off all power supplies at least 10 min. before disassembling work.
Procedure
Outdoor Unit
Points
As three hooks are provided,
slide the cover downward to
remove.
The forced cooling operation
in the pumping down mode
can be carried out by
pushing the operation switch
on the main unit for five
seconds. (The existing
models can do it through the
switch on the PC board just
as well.)
The layout of the connection
ports for the flares has been
changed to horizontal
position from vertical
position.
127