2. Assembly SUB HSG MODULE:
2.1 SCM and FM Assembly
I.
Hook "Cover SUB Clip Side" on SUB HSG. (Fig. 2-1 & 2-2)
II.
Place SCM on SUB HSG SCM DTM and makes SCM touching DTM truly. (Fig. 2-3 & Fig.
2-4)
III.
Assemble "Cover SUB Clip Down" on SUB HSG and lock with screw well. (Fig.2-5).
IV. Hook "Cover SUB Clip Up" on SUB HSG to fix SCM. (Fig. 2-6)
V.
Check mark point of FM and place FM on SUB HSG FM DTM. (Fig. 2-7 & Fig. 2-8)
VI. Hook "Clip FM" on SUB HSG to fix FM. (Fig. 2-9)
VII. Assemble "Clip FM2" on SUB HSG and lock with screw well. (Fig. 2-10)
VIII.
Paste " AL Sponge" on cannelure of SUB HSG (Fig. 2-11).
IX. Paste "Mylar Sub HSG" align the edge on outside of sub HSG. (Fig. 2-12)
Overfill adjustment screws
1. Hook top of LP
Baffle first
Fig. 1-6
Fig. 1-5
105
LP Datum of DMD HSG
2. Hook bottom of
LP Baffle well
Fig. 1-7