INSTALLATION
The unit comes with low voltage wire and a battery extension wire installed.
1) Run supplied wire to desired location - to a max. of 9 feet.
2) Install supplied electrical box in desired location.
3) Remove center knock out from electrical box and install strain relief
(strain relief nut not required).
4) Route low voltage wire and battery extension wire through the strain
relief.
5) Connect low voltage wire to supplied switch, fasten switch to right side of
electrical box (polarity not important).
14
919-070

PTO30 WALL SWITCH INSTALLATION

PTO30 WALL SWITCH INSTALLATION
(INCLUDED WITH UNIT)
(INCLUDED WITH UNIT)
Center knock out
Strain Relief
6) Install supplied 4-AA batteries into the battery holder. Using velcro install
battery holder to the backside of the battery compartment door. Connect
battery terminal.
7) Using silicone, completely seal strain relief to protect from water or moisture.
8) Place supplied gasket on top of electrical box.
9) Fasten cover to electrical box using supplied screws.
10) Place switch in OFF position until fi nal installation is complete.
1
Regency Plateau™ PTO30 Outdoor Gas Fireplace
PTO30 / PTO60
08/15/11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plateau pto30-ulpg1Plateau pto30-lpg1

Table of Contents