PTO30
INSTALLATION
8. Secure all tall vertical supports (Part B) to Top and Bottom Frame (Part
10. Install two (2) headers (Part F) with four (4) screws each to complete
A) with three (3) screws each,
frame installation
Diagram 13 & 14 -
Diagram 10
Part F
If installing optional panels - continue on to next section.
OPTIONAL PANELS:
1. Bend tabs on top fl ange of side panel to 90º.
Diagram 11 - Screw Locations
9. Install four(4) short horizontal supports (Part E) - using four (4) screws
Diagram 1 - Bend tabs to 90º
for each support.
2. Position panel - lower tabs line up with indents in base.
Diagram 2 - Lower tabs on panel aligned with base
Diagram 12 - Part F locations
22
Regency Plateau™ PTO30 Outdoor Gas Fireplace
3
10/24/12
919-167a