1. Parts and the Form
Item
UNIT SERVICE WRENCH
LEVELLING LEG
2. Installation Order
1 Place the dryer on the flat ground. Keep the unit at least 12 inch away from the wall.
2 Check the 4 legs and the gap between the unit and floor. The dryer should be stable when
you try to move the unit to the left or right.
? Balance the unit on the floor with the leg adjustment so that the inclination is not greater than 1 inch.
Form
FOOT
A
j d
s u
m t
e
t n
29
1 Used when raising
LOCKING
NUT
i M
c s
l l e
n a
– Turn the leg clockwise to raise the unit
– Turn the leg counterclockwise to lower the
unit