Daikin FCQ35B7V1 Service Manual page 371

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

ESIE05-04
1.15.8 Drain Hose Piping to the Left
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Removing the front grille in
accordance with "Removal
of Front Grille".
1
Pull out the drain hose
attached on the rear right
of the unit.
2
Pull out the drain plug
and drain socket
attached on the rear left
of the unit.
3
Piping of Drain Hose at
Left Side.
4
Insert the drain plug and
drain socket into the right
side of the unit with
hexagonal pin wrench.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance
Points
The drain pan and bottom
frame are designed as an
integral-type.
Insert the drain hose to the
hose plug securely as far as it
will go.
Insert the drain plug and
socket securely as far as it will
go.
5–121
1
3
5
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents