Daikin FCQ35B7V1 Service Manual page 273

Hide thumbs Also See for FCQ35B7V1:
Table of Contents

Advertisement

ESIE05-04
1.11.1 Removal of Suction Grille
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
1 Removing the suction grille
1
Push the 2 buttons
simultaneously and pul
the suction grille down
slowly.
2
With the suction grille
open at an angle of 45°,
lift it up to remove it.
Part 5 – Disassembly and Maintenance
Procedure
Push the buttons and pull down
Open te 45°
Suction grille
Disassembly and Maintenance
Points
When closing, push up the
grille slowly.
Grille is attached with 3 hooks
5–23
1
3
5
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents