Disassembly and Maintenance
1.11.4 Removal of Horizontal Blade
1
Warning
Procedure:
Step
1
Remove 4 screws each
(16 screws in total) to
dismount the 4 seal
materials.
3
2
Remove 2 screws each
(16 screws in total) to
dismount the 8
horizontal blade
5 5
bearings.
5–28
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure
Horizontal
blade
bearing
Seal material
Swing motor
Horizontal blade
ESIE05-04
Points
Reassembling
Make sure that the air outlet
insulation material (seal
material) is as shown below
(may result in dew
condensation).
Air outlet insulation material
Seal
material
No catching or gap is allowed for
the seal material