Maytag MAH4000AWQ NEPTUNE Installation Instructions Manual page 6

High-efficiency washer
Table of Contents

Advertisement

Read this before you start. .....
TOOLS needed for _nsta_lation.
• channel lock
• 5/16 nut driver
• level
//__/
•crescent wrench
• screwddver f[atb{ade
Items p[ovided
I
I
• 1/2 Box endwrench
®T @@
I
@@
STEP ONE - PREPARE
WASI-_R
1. Carefully remove any packaging materials from the outside of the washer. Set aside two
corner posts for installation. IMPORTANT:
Notice that the hoses and power cord are tied
up with a shipping strap. The strap SHOULD NOT BE CUT OR REMOVED until the
machine is ready to be installed.
:
:
2. Locate the metal buckles attached to the shipping straps at _e back of the washer. Care-
fully cut away straps near both buckles, completely removing both buckles from the washer.
Pull loose straps from back of washer one at a time until all straps have been removed.
_
J

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents