Preliminary Steps; Installing The Processor - Fujitsu PRIMERGY RX2530 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2530 M1:
Table of Contents

Advertisement

Processors

11.2.1 Preliminary steps

"Disabling SVOM boot watchdog functionality" on page 72
Ê
"Suspending BitLocker functionality" on page 71
Ê
"Shutting down the server" on page 48
Ê
"Disconnecting the server from the mains" on page 49
Ê
"Getting access to the component" on page 49
Ê
"Removing the CPU air guides" on page 68
Ê

11.2.2 Installing the processor

Removing the socket cover
Figure 163: Opening socket release lever 1
Ê Unlatch the socket release lever 1 marked Open 1st by pushing it down and
away from the socket (1).
Ê The socket release lever 1 will slightly lift up (2).
242
Upgrade and Maintenance Manual
RX2530 M1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx2530 m2

Table of Contents