3-1-3 Switch

Sign of
Label
the
figure
F
G

3-1-4 Setting Switch

After changing the "Setting" switch, follow the procedure described below.
After changing the "Setting" switch, turn off the AC input, wait until the status indicator is
completely OFF, and then turn on the AC input.
Use a fine-pointed tool such as a small screwdriver to maneuver the switch's lever.
ON
BA75T/BA100T/BA100R
3-1 The name and function for the operation and display
Name
Power switch
ON: Press the "Power" switch of the UPS. The power output from
the UPS begins.
OFF: Press the "Power" switch of the UPS in ON state, then the
power output from the UPS stops.
Additional Information:
・ If the AC input is connected to the commercial power source,
then the battery will be charged regardless of the "Power" switch.
Buzzer Pause/
Stop the beeper by pressing for 0.5 seconds or longer
Test switch
Setting switch function list
Bit
Function to set
Setting for beeper sound
1
in the event of power
failure, etc.
Auto startup setting after
2
recovery from power
failure
Setting for whether or not
3
to perform test once
every 4 weeks
Auto startup mode setting
4
by BS signal
Logic of Remote on/off
5
signal
6
---
Synchronous /
7
asynchronous
8
operation
setting
3 Check and start operation
Description
OFF side
Beeper sounds
Auto startup is
performed
Test is performed
Mode A
Short-circuit, Stop
---
Bit 7
Bit 8
Operation Mode
Commercial synchronous
OFF
OFF
operation (ECO mode disabled)
Commercial synchronous
OFF
ON
operation (ECO mode enabled)
Asynchronous operation
ON
OFF
(50 Hz output)
Asynchronous operation
ON
ON
(60 Hz output)
3
ON side
Beeper does not
sound
Auto startup is not
performed
Test is not
performed
Mode B
Open-circuit, Stop
---
35