Procedure From Installation To Operation - Omron BA75T Instruction Manual

Table of Contents

Advertisement

Procedure from installation to operation

The procedure from installation to operation is shown below.
Read "Safety precautions"
Page 7
Remove the product from the
package and check the contents
1. Preparation
Perform installation and connection
2. Installation and connection
Are you using either of the
following functions?
- UPS monitoring software
- Contact signal
No
Check the operation
3. Check and start operation
(Charge the battery *)
Operate
3. Check and start operation
Perform maintenance and inspection
4. Maintenance and Inspection
Replace the battery
4.2 Replacing the battery
BA75T/BA100T/BA100R
Procedure from installation to operation
Start
Installation/connection
Yes
5. To perform shutdown processing of the
devices when a power failure occurs
6. Using the contact signal functions
Preparation for operation
* The UPS has been charged prior to shipment.
However, if it is left for a long period of time, it
may have self-discharged.
We recommend charging the UPS before using it.
No
Perform maintenance
The battery must
be replaced
Yes
Operate
and inspection
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ba100tBa100r

Table of Contents