Installing The Cover - IBM eServer 200 xSeries User Reference Manual

Type 8479
Hide thumbs Also See for eServer 200 xSeries:
Table of Contents

Advertisement

Complete the following steps to install a U-bolt.
1. Turn off the server and peripheral devices and disconnect all external cables and
2. Use a screwdriver to remove the two metal knockouts.
3. Insert the U-bolt through the rear panel; then, attach and tighten the nuts.
4. If you have other options to install or remove, do so now.
5. Reinstall the side cover. See "Installing the cover" for details.
6. Thread the cable through the U-bolt and around an object that is a part of or
7. Reconnect the external cables and power cords; then, turn on the peripheral

Installing the cover

The following information describes the cover installation procedure.
50
IBM xSeries 200: User's Reference
— A 19 mm (0.75 in.) U-bolt or wire rope (similar to National Manufacturing No.
3230, Stock No. 176-735)
— Threaded nuts that fit the U-bolt
— A security cable
— A lock, such as a combination lock or padlock
Read "Safety information" on page 28 and "Handling static-sensitive devices" on
page 27.
power cords; then, remove the cover (see "Removing the side cover" on page 33
for details).
permanently secured to the building structure or foundation, and from which it
cannot be removed; then, fasten the cable ends together with a lock.
devices and the server.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents