Log Installation - Quadra-Fire DV-40 Installation, Operation, Venting And Maintenance Instructions

Table of Contents

Advertisement

Lighting and pressure testing
24.
Apply gas to system and re-light appliance according to lighting instructions.
25.
With the main burner "ON", test the new pressure regulator assembly for leaks using soap bubbles
or a gas leak detector.
26.
Re-light the main burner in both the HI and LO positions and verify proper burner ignition and
operation.
INSTALLER NOTICE: These instructions must be left with appliance.
Proper installation of this log set and nuggets are critical to the safety,
CAUTION: LOGS ARE EXTREMELY FRAGILE--HANDLE WITH CARE.
NOTE: Logs are numbered on the bottom for ease of identification.
1.
Remove cardboard box located between firebox and pallet if you have not already done so. Carefully
unpack center and top logs and other parts.
2.
Loosen door set screw located next to handle in casting using allen key supplied.
NOTE: The right and left main logs are shipped inside the firebox of the unit and need to be checked
for damage that may have occurred during shipping.
3.
Place center log, #23, on positioning pegs in center burner pan with the black char end facing
forward. See FIGURE 1
4.
Empty nugget bags on a paper towel or other discardable surface, and place nuggets randomly on
top of the "U" burner. Cover entire burner evenly with a single layer of nuggets. See FIGURE 2
5.
Place left top log, #22, on peg of left main log and peg of center log. See FIGURE 3
6.
Place end of right top log, #24, on top of left top log notch, and front of log on the peg of right log
bracket. See FIGURE 4
CONVERSION INSTRUCTIONS, (CONT.)

LOG INSTALLATION

WARNING !
performance, and aesthetics of this appliance.
Follow each step accurately.
Page 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents