Gas Conversion Instructions (Ng To Lp Or Lp To Ng) - Quadra-Fire DV-40 Installation, Operation, Venting And Maintenance Instructions

Table of Contents

Advertisement

GAS CONVERSION INSTRUCTIONS FOR LP AND NG
The installation of this conversion kit must only be undertaken by a qualified and certified
CAUTION: DISCONNECT ANY ELECTRICAL CORDS AND TURN OFF GAS SUPPLY TO UNIT
BEFORE PROCEEDING.
Valve Regulator Tower
1.
Turn control knob to the OFF position and shut off the gas supply to the valve.
2.
Using a Torx T20, or slotted screwdriver, remove the three pressure regulator mounting screws (A),
pressure regulator tower (B), and diaphragm (C). (You may wish to retain these items for converting
back to original gas if necessary.)
3.
Insure that the rubber gasket (D) is properly positioned and install the new HI/LO pressure regulator
assembly to the valve using the new screws (E) supplied with the kit. Tighten screws securely.
(Reference torque = 25 in/lb)
4.
Install the enclosed identification label (F) to the valve body where it can be seen.
WARNING !
gas appliance installer.
Page 32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents