Control; Wiring - Carrier 40MB*D Installation Instructions Manual

Ducted heat pump split system sizes 09 to 48
Hide thumbs Also See for 40MB*D:
Table of Contents

Advertisement

11.1Motor
and drain pump maintenance
(Use rear ventilated as example)
Motor maintain:
1.
Take off the ventilated panel.
2.
Take off the blower housing.
3.
Take off the motor.
Mofor
+
Pump maintainance:
1.
2.
3.
12.
--
Ventilated
panel
+
Fig.11-1
1
Screw off four screws from drain pump.
Plug off pump power supply and water level switch cable.
Take off _
CONTROL(ONLY FOR INVERTERUNITS)
• The capacity of the system and the network address of
the air-conditioner
can be set by the switches
on the
indoor Main Control Board,
• Before setting, turn off the power, After setting, restart
the unit,
• Setting is not allowed when the unit is power on,
12.1 Horsepower
code setting
The capacity
of the indoor unit has been set in the
factory
according to the below table,
Horsepower code
POWER
$
%
ENC1
Table 12-1
8
10.5
9
14.0
A
16.0
12.2
Network
address
set
Every air-conditioner
in the network
has only one network
address to distinguish each other. The address code of air-con-
ditioner in LAN is set by code switches $1 & $2 on the Main
Control Board of the indoor unit, and the set range is 0-63.
Table 12-2
13. WIRING
The
appliance
shall
be installed
in accordance
with
national wiring regulations,
The air conditioner
should use a separate power supply
with rated voltage,
The external power supply to the air conditioner
should
be grounded, which is linked to the ground wiring of the
indoor and outdoor unit,
The wiring
work should
be done by qualified
persons
according
to the wiring diagram,
A circuit breaker and a residual current device (RCD) with
10mAor
above
rating
shall be installed
in the power
circuit according
to the national rule,
Be sure to locate the power wiring and the signal wiring
well to avoid cross-disturbance,
Do not turn
on the power
until you
have confirmed
proper wiring,
The power cord type is H07RN-F,
NOTE
Refer to EMC Directive 2004/108/EC
To prevent
flicker
impressions
during
the
start
of the
compressor,
the following installation conditions
apply.
1
The power connection
for the air conditioner
has to be
done at the main power distribution. The distribution
has
to be of a low
impedance,
normally
the
required
impedance
reaches at a 32 A fusing point.
No other equipment has to be connected
with this power
line.
2
3
4
5
13.1
For detailed
installation
acceptance
please refer to your
power supplier, to verifyif restrictions apply for products
like washing
machines,
air conditioners
or electrical
ovens.
For power details of the air conditioner
refer to the rating
nameplate of the product.
For any questions contact your local dealer.
Connect
the cable
Disassemble
the cover.0f there isn't a cover on the outdoor
unit, disassemble the screw from the maintenance
board, and
pull it in the direction of the arrow to remove the protection
board.)
Connect the cables to the terminals correspondingly.
Re-install the cover or the protection board.
13.2 The Specification
of Power
(Refer to Table14-1~14-3)
13.3 Wiring
figure
(Refer to Fig. 13-3-Fig. 13-6)
1.split type outdoor unit
Cover
Protection
board
Fig. 13-1
2O

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

40mb d series40mbd-01si

Table of Contents