Connect T Hedrainpipe - Carrier 40MB*D Installation Instructions Manual

Ducted heat pump split system sizes 09 to 48
Hide thumbs Also See for 40MB*D:
Table of Contents

Advertisement

Table 9-1
144_-- 176 kgf.cm
(14.2 -_17.2 N.m)
333---407 kgf.cm
(32.7 -_39.9 N.m)
504 -_616 kgf.cm
(49.5"---60.3 N.m)
630--_770 kgf.cm
(61.8"--_75.4 N.m)
0.327in/8.3
0.472in/12.0
0.606in/15.4
0.732in/18.6
0.343in/8.7
0.488in/12.4
0.622in/15.8
0.748in/19.0
90°i4
Expel the air with a vacuum pump(Refer to Fig.9-3)
(Please refer to its manual for the method of using the
manifold valve)
Loosen and remove the nuts of service valves A and B,
and connect the charge hose of the manifold valve with
the maintenance terminator
of service valve A. (Be sure
that service valves A and B are both closed)
Connect the joint of the charge hose with the vacuum
pump.
Open the Lo-lever of the manifold valve completely.
Turn on the vacuum pump. At the beginning of pumping,
loosen the nut of service valve B a little to check whether
the air comes in (the sound of the pump changes, and
the indicator of compound meter turns below zero). Then
fasten the nut.
When the pumping has finished, close the Lo-lever of the
manifold valve completely
and turn off the vacuum pump.
When you have pumped for over 15 minutes, please
confirm that the indicator of multimeter is on -1.0X10-_Pa
(-76cmHg)
Loosen
and remove the nuts of service valves A and B to
open service valve A andB completely, then fasten nuts.
Disassemble
the charge hose of service valve A, and
fasten the nut.
ManifoEd va(ve
MultFmeter
Pressure
meter
-76 cmHg
Lo-lever
HHever
Charge
hosem=,.-
Charge
hose
_
Vacuum
pump
Fig.9-3
_L
CAUTION
Both service valves should be open before test operation.
Each air conditioner
has two service valves of different
sizes.(Refer
to Fig.8-4)
Flare nut
Stopper
Cap
9.2
Check
the Leakage
Check all the joints with the leak detector or soap water. (Refer
Fig.9-5 as a reference illustration)
in the chart
A ...... Lo-stop valve
B...... Hi-stop valve
C,D..Joints
of the connecting pipe to the indoor unit.
Check-point of indoor unit _C
Check-point of out!!or uni_J
Fig.9-5
9.3
Insulation
Be sure to completely insulate all the exposed parts of the flare
pipes.
Incomplete insulation may cause condensation.
10.
CONNECT T HEDRAINPIPE
Install
the drainpipe
of the indoor unit
Use a polyethylene
tube as the drainpipe (out-dia.1.14-1.22in
/29-31mm,
in-dia.0.984in/25mm).
When extending
the drainpipe,tighten
the connector
with
water-proof
tape to prevent leakage.
Lean the drainpipe
down toward
outdoor (outlet-side)
at a
degree of over 1/ 50 to keep water from flowing back. And
please Avoid any bulge.
Do not drag the drainpipe roughly. One support point should
be set every
3.28~4.92ft/1~1.5m
to prevent
the drainpipe
from yielding. Or tie the drainpipe with the connecting
pipe to
fix it.
If the outlet of the drainpipe is higher than the body's pump
joint, the pipe should be arranged
as vertically as possible.
And
the lift distance
must be less than
21.65in!550mm,
otherwise
the water can not be lifted completely
and may
cause overflow.(Only
available for the unit with a pump.)
The end of the drainpipe should be over 1.969in/50mm
higher
than the ground
, and do not immerse
it in water.
If you
discharge the water directly into sewage, be sure to make a
U-form aqua seal by bending the pipe up to keep the foul gas
entering the house through the drain pipe.
Valve body
Valve stern
Fig.9-4
]8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

40mb d series40mbd-01si

Table of Contents