Vent Requirements - Lopi allegiance Owner's Manual

Direct vent
Table of Contents

Advertisement

Installation
8

Vent Requirements

!
Always maintain the required 1" (25 mm) clearance (air space) to combustible materials to prevent a fire
hazard. Do not fill air spaces with insulation.
!
The gas appliance and vent system must be vented directly to the outside of the building, and never
be attached to a chimney serving a separate solid fuel or gas-burning appliance. Each direct vent gas
appliance must use it's own separate vent system.
Altitude Considerations
This heater has been tested at altitudes
ranging from sea level to 8,000 feet
(2,400 M). In this testing we have found
that the heater, with its standard orifice,
burns correctly with just an air shutter
adjustment.
!
Failure to adjust the air shutter properly
may lead to improper combustion which
can create a safety hazard. Consult your
dealer or installer if you suspect an
improperly adjusted air shutter.
When the vent passes through a wall,
a wall thimble is required. When the
vent passes through a ceiling, a
support box or firestop is required.
When the vent passes through the
roof, a roof flashing and storm collar
are required. Follow the instructions
provided with the vent for installing
these items.
Use of of the following 6-5/8" diameter co-axial gas direct vent systems:
Slide the vent sections together and turn 1/4 turn until the sections lock in place.
Screws are not required to secure the vent. However, three screws may be used to secure
vent sections together if desired.
High temperature sealant is recommended at the appliance starter section connection (use
high-temperature silicone or Mill-Pac®).
If disassembly is required, at time of re-assembly check to see if the vent creates a tight fit. If
it does not, apply high temperature sealant to the joints of the affected sections.
Horizontal sections require a 1/4" rise every 12" of travel
Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)
Travis Industries
Manuafacturer
Simpson Dura-Vent
Selkirk Hearth Products
American Metal Products
N O T E : Always use the high-wind cap for the type of vent you are using (if applicable)
(for qualified installers only)
Vertical Termination
(Duravent Part # 991)
Use a roof flashing and storm collar
whenever passing through the roof
(Duravent Part #953 & #943 or #943S)
Use a firestop spacer whenever
passing through a ceiling
(Duravent Part #963)
Minimum framing
for fire stop
8-5/8"
(220 mm)
Use a support box
on exposed vent
Use a wall thimble
whenever passing
through a wall
(Duravent Part #942)
8-5/8"
(220 mm)
Minimum
Framing for
wall thimble
Maintain a minimum 1" (25 mm)
clearance from vent to any combustible
(vent is 6 5/8" (170 mm) diameter)
Series
Model GS
Direct-Temp
Ameri-Vent
4041220
Vertical Vent
Requirements
Maintain a minimum 1"
(25 mm) clearance from
vent to any combustible
(vent is 6 5/8" (170 mm)
diameter)
Horizontal Vent
Requirements
Horizontal Termination
(Duravent Part #984)
9 3 5 0 8 1 2 3

Hide quick links:

Advertisement

Table of Contents
loading