INTRODUCTION
1. Bearing
2. Proper strength Loctite
3. Shaft
1. Clean shaft external contact surface.
2. Clean internal contact surface of part to be in-
stalled on shaft.
3. Apply a strip of proper strength Loctite on cir-
cumference of shaft contact surface at inser-
tion or engagement point.
NOTE: Retaining compound is always forced out
when applied on shaft.
4. DO NOT use antiseize Loctite or any similar
product.
5. No curing period is required.
Mounting in Tandem
1. Apply retaining compound on internal contact
surface (bore) of parts to be installed.
2. Continue parts assembly as per previous illus-
tration.
Threadlocker Application for Case-In
Components (Metallic Gaskets)
1. Proper strength Loctite
1. Clean inner housing diameter and outer gasket
diameter.
2. Spray housing and gasket with
.
N (P/N 293 800 041)
XX
3. Apply a strip of proper strength Loctite on lead-
NOTE: Any Loctite product can be used here. A
low strength liquid is recommended as normal
strength and gap are required.
4. Install according to standard procedure.
5. Wipe off excess product.
6. Allow 30 minutes for product to cure.
NOTE: Normally used on worn-out housings to
prevent leaking or sliding.
It is generally not necessary to remove gasket
compound applied on outer gasket diameter.
LOCTITE PRIMER
ing edge of outer metallic gasket diameter.
tmr2013-002