Toshiba PORTÉGÉ M700 Maintenance Manual page 174

Hide thumbs Also See for PORTÉGÉ M700:
Table of Contents

Advertisement

3 Tests and Diagnostics
Subtest B
Intel AMT
It checks whether the Intel AMT corde versions information are written.
Intel Kedron
BIOS should be
Subtest C
Degitizer utility
NOTE: 1. To perform this subtest, connect the AC adapter.
2. While performing this test, don't turn off the power by any means.
If the power is turned off, there is a possibility that the machine may not start.
This subtest checks the operation and compensates the position of the digitizer.
If this subtest is performed, the computer will reboot in order to rewrite the
program of the digitizer.
Therefore, it takes time for a while until the test starts.
Don't turn off the power by any means during this operation.
1) In the case of the model which carries both the digitizer and the touch panel,
perform the following Step1.
2) The model which carries only the digitizer (without touch panel) performs
only the functional check of the digitizer automatically.
Step 1 For Digitizer and Touch panel model
Since four crosses are displayed on a screen, touch the center of them which
indicated in green in order with a tablet pen.
Since the touch-panel compensation data is written in by this test, please touch
the center of each cross with a tablet pen carefully.
(If the compensation value is wrong, the touch panel cannot be used during
Windows operation.)
In the both cases, when the test ends normally, the computer will reboot in
order to rewrite the program of the digitizer again.
3-52
is required for an
AMT correspondence.
Intel
+
+
[CONFIDENTIAL]
AMT check.
Intel
+
+
PORTEGE M700 Maintenance Manual (960-661)
Rev C

Advertisement

Table of Contents
loading

Table of Contents