Wall Switch Installation; Ipi System Wiring Diagram - Vermont Castings VFF32LI Installation & Operating Instructions Manual

Table of Contents

Advertisement

VFF Vent Free Fireplace System

WALL SWITCH INSTALLATION

The wall switch wire connection is located off the wire
harness coming out of the IPI Control Board. The label is
wired 'wall switch'. Connect the low voltage switch wires to
the two (2) terminals labeled "wall switch" from the control

IPI SYSTEM WIRING DIAGRAM

BLACK
RED
Figure 20 –
IPI System Wiring Diagram
Electrical connections should only be performed by a qualified, licensed electrician. Main
power supply must be turned off before connecting fans to the main electrical power supply
or performing service.
20
ORANGE
YELLOW
BLACK
BROWN
ELECTRICAL INSTALLATION – IPI
board. Run wire to desired location on wall. Up to 50 feet
of 18 gauge wire may be used if necessary. Attach wires
to wall switch. Mount the wall switch in a junction box and
screw on cover. Figure 20
RED
RED
RED
BLACK
BLACK
RED
20308184

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vff32lvVff36liVff36lvVff32ciVff36ciVff32cv ... Show all

Table of Contents