Water Pump; Ice Thickness Probe - Manitowoc Q 800 Installation And Use Manual

Manitowoc marine q 800 ice machine installation and owner/operator use and care manual
Hide thumbs Also See for Q 800:
Table of Contents

Advertisement

Maintenance

Water Pump

Disconnect the electric power to the ice machine at
the electric service switch box and turn off the
water supply.
1. Disconnect the water pump power cord.
POWER
CORD
WATER
PUMP
Water Pump Removal
2. Disconnect the hose from the pump outlet.
3. Loosen the screws securing the pump mounting
bracket to the bulkhead.
4. Lift the pump and bracket assembly off the
screws.
4-6
WARNING
LOOSEN
SCREWS
PUMP
OUTLET
SV1618

Ice Thickness Probe

1. Compress the side of the ice thickness probe near
the top hinge pin and remove it from the bracket.
DISCONNECT
WIRE LEAD
COMPRESS
HINGE PIN
TO REMOVE
Ice Thickness Probe Removal
NOTE: At this point, the ice thickness probe can
easily be cleaned. If complete removal is desired,
continue with step 2 below.
Disconnect the electric power to the ice machine at
the electric service switch box.
2. Disconnect the wire lead from the control board
inside the electrical control box.
Section 4
ICE
THICKNESS
PROBE
WARNING
SV1619

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents