NETGEAR ProSAFE M5300 Series Software Administration Manual page 481

Managed switches
Hide thumbs Also See for ProSAFE M5300 Series:
Table of Contents

Advertisement

2.
After Switch A reboots, check the stack port configuration.
(Netgear Switch) #show port 2/0/28
Admin
Intf
Type
Mode
------ -----
-------
2/0/28
Enable
3.
On Switch B, configure the stack port and reboot the switch.
(Netgear Switch) #
(Netgear Switch) #show stack-port
Unit Intf
SlotId Type
---- ----- ------ ------
1
0/51
AX742
1
0/52
AX741
(Netgear Switch) #config
(Netgear Switch) (Config)#stack
(Netgear Switch) (Config-stack)#stack-port
(Netgear Switch) (Config-stack)#exit
(Netgear Switch) (Config)#exit
(Netgear Switch) #reload
Are you sure you want to reload the stack? (y/n) y
4.
After Switch B reboots, check the stack port configuration.
(Netgear Switch) #show port 2/0/28
Admin
Intf
Type
Mode
------
-----
-------
1/0/51
Enable
10G Full 10G Full
Managed Switches
Physical
Physical
Mode
Status
--------
---------
10G Full
10G Full
Configured Running
Stack
XFP Adapter
Mode
-----------
-------
(stack)
Ethernet
Ethernet
Physical
Physical
Mode
Status
--------
---------
Up
Switch Stacks
481
Link
Link
LACP
Status
Trap
Mode
------
-------
-------
Up
Enable
Enable
Stack
Link
Mode
Status
------
-----
Ethernet
Link Down
Ethernet
Link Down
1/0/51 ethernet
Link
Link
LACP
Status
Trap
Mode
------
-------
------
Enable
Enable
long
Actor
Timeout
------
long
Link
Speed
(Gb/s)
-----
12
10
Actor
Timeout
------

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prosafe m6100 seriesProsafe m7100 series

Table of Contents