Install Solar Panel(S) - Chamberlain LA412 Instruction Manual

Residential dc solar vehicular swing gate operator
Hide thumbs Also See for LA412:
Table of Contents

Advertisement

STEP 10

INSTALL SOLAR PANEL(S)

SELECT SITE FOR SOLAR PANEL(S)
The solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. The solar panel(s) comes with a 10 foot
(3 m) cable. If a location near the control box cannot be found, an additional cable will be required. The LA412DC Solar Gate Operator is not supported
in northern climates where temperatures reach below -4° F. This is due to cold weather and a reduced number of hours of sunlight during the winter
months. Cycle rate may vary from solar chart for areas that reach below 32° F. Solar panels should be cleaned on a regular basis for best performance
to ensure proper operation.
SOLAR ZONES
1
ZONE 1 (6 Hours of Sunlight/Day): Ideal for solar
application
ZONE 2 (4 Hours of Sunlight/Day): Recommended
2
for solar application
3
ZONE 3 (2 Hours of Sunlight/Day): Success of
solar application will depend on type of gate
operator and location of the solar panel
NOT AVAILABLE
INSTALLATION
1
22
NOT AVAILABLE
3
2
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La400pkguLa400dcsLa400dcLa412dcLa412pkguLa412dcs

Table of Contents