Install The Control Box - Chamberlain LA412 Instruction Manual

Residential dc solar vehicular swing gate operator
Hide thumbs Also See for LA412:
Table of Contents

Advertisement

STEP 5

INSTALL THE CONTROL BOX

For Large Metal Control Box installation, refer to the following page.
STANDARD CONTROL BOX
The control box MUST be mounted within 5 feet (1.52 m) of the gate
operator. Mount the control box as high as possible for best radio
reception. Make sure the control box is level.
1. Remove the screws and open the control box.
2. Select the mounting holes (according to your application) and
remove the knockouts using a screwdriver and hammer.
3. Secure the control box to mounting surface.
A. Wall or Column: Use the provided screws (4).
B. Post: Use U-bolts and rubber washers (not provided) to ensure a
watertight seal. Make sure the U-bolts do not protrude more than
3/4 inch from the control box because this can short the control
board.
INSTALLATION
14
WALL OR COLUMN MOUNT
9 1/8"
POST MOUNT
6 3/8"
4 3/8"
3 7/8"
5 7/8"
4 7/8"
2 7/8"
13 3/4"
12 1/16"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La400pkguLa400dcsLa400dcLa412dcLa412pkguLa412dcs

Table of Contents