Optional Backup Battery Installation - AT&T SynJ SB67158 User Manual

Dect 6.0 4-line corded/cordless small business system
Hide thumbs Also See for SynJ SB67158:
Table of Contents

Advertisement

Getting started

Optional backup battery installation

In the event of a power failure, if four AA batteries (purchased separately)
are installed in the telephone, your telephone base can still operate. All
lines will work.
If power fails during a call on the telephone base, the call continues until
you hang up. If power fails during a call on a handset, you can still make and
answer calls. During a power failure, although the screen backlight is off, you
can still make and answer calls. If the power resumes while you are on a call,
the call continues.
Install the batteries, as shown below:
Step
1
Open the backup
battery compartment
cover.
Step
2
Place the batteries
in the compartment
following the polarity
label +/-.
NOTES:
1.
Use disposable AA alkaline batteries only. Do not use rechargeable batteries.
2.
When the backup battery is in low battery mode, the screen displays Low battery.
Step
3
9
Align the cover flat
against the battery
compartment, then
slide it to the left
until it clicks into
place to lock the
cover.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents