Gas Supply Requirements - Haier HCR2250ADS Installation Instructions Manual

24” and 36” dual fuel free-standing range
Hide thumbs Also See for HCR2250ADS:
Table of Contents

Advertisement

GAS SUPPLY REQUIREMENTS

Use a new CSA International approved gas supply line.
Install a shut-off valve.
Securely tighten all gas connections.
If connected to LP, have a quali ed person make sure gas pressure
does not exceed 14" (36 cm) water column.
Examples of a quali ed person include:
licensed heating personnel,
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion or re.
Observe all governing codes and ordinances.
IMPORTANT: This installation must conform with all local codes and ordinances.
In the absence of local codes, installation must conform with American National
Standard, National Fuel Gas Code ANSI Z223.1 - latest edition or CAN/CGA B149 –
latest edition.
IMPORTANT: Leak testing of the range must be conducted according to the
manufacturers instructions.
TYPE OF GAS
Natural gas:
This range is design-certified by CSA International for use with Natural gas or, after
proper conversion, for use with LP gas.
This range is factory set for use with Natural gas. See "Gas Conversions"
section. The model/serial rating plate located on the right side oven door trim
has information on the types of gas that can be used. If the types of gas listed do
not include the type of gas available, check with the local gas supplier.
LP gas conversion:
Conversion must be done by a qualified service technician.
No attempt shall be made to convert the appliance from the gas specified on the
model/serial rating plate for use with a different gas without consulting the serving
gas supplier. See "Gas Conversions" section.
WARNING
Explosion Hazard
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcr6250ads

Table of Contents