Ravenheat CS 80 T Instructions For Use Installation And Servicing page 63

High efficiency condensing combination boiler
Table of Contents

Advertisement

Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manu acturers instructions and the data elds on the commissioning chec list
completed in full.
o instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
o maintain the boiler guarantee it is essential that the boiler is ser iced annually
by a
as afe registered engineer who has been trained on the boiler installed.
he ser ice details should be recorded on the enchmar
ecord and left with the householder.
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
er ice Inter al
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 90 t

Table of Contents