Ravenheat CS 80 T Instructions For Use Installation And Servicing page 33

High efficiency condensing combination boiler
Table of Contents

Advertisement

Cut a 105 mm diameter hole through the ceiling and/or
roof, at the point previously marked.
Fit a roof flashing slate to the roof, available from
Ravenheat. Insert the Vertical Flue terminal assembly
through the flashing slate from the outside.
Lift the boiler on the wall, locating onto the top two
fixing bolts. Tighten the two bolts using a spanner to
secure to the wall.
Measure the vertical distance between the top of the
flue and the bottom of the flue terminal assembly (fig.
21). The measurements should be taken from the outer
diameter of the flue.
NOTE: Where this length does not match any standard
combination of the extensions, only the
be cut to the required length (fig. 23).
When cutting both inner and outer ducts of the
extension, always cut on spigot side, and they must
be de-burred.
ACCESSORIES CONCENTRIC FLUE 60/100 EXTRAS:
TABLE 7
Part. No.
PR5094110A
PRFE
PR45FBI
PR90FBI
PR5023016
TER110200
Straight Flue
L = 12 m Max
plus Combi ridge
Fig.23
the extension can
Description
Straight fl ue header / sample point
60/100
Flue Extension 60/100 L1000
45° bend 60/100
90° Elbow bend 60/100
Horizontal terminal 60/100
Vertical fl ue Terminal
Offset Flue
L = 12 m Max
plus 2 bend 90°
and Combi ridge
Starting at the appliance end, assemble the
extension duct sections, making each inner and
outer (flue) joint by inserting the spigot end into
the socket end of the next tube, making sure the
seal rings are correctly located (fig. 22). Make sure
that the entire flue is adequately supported. Use at
least one bracket for each extension used.
Ensure that all inner flue connections have a good
fit/seal, and that the space clips in each extension
are correctly positioned.
Fig. 21
Offset Flue
L = 11 m Max
plus 2 bend 45°
and Combi ridge
Fig.22
KEY
56 - Flue adapter
58 - Header gasket
59 - Rubber seal Ø 60
60 - Fumes sample point
63 - Flue extension
64 - Flue exhaust duct extension
65 - Flue manifold rubber seal
66 - Securing screw
68 - Flue starter
69 - Air sample point
IMPORTANT: Please lubricate the
internal part of the seals before
fitting.