Samsung AVXC1H022 series Service Manual page 330

System air conditioner
Table of Contents

Advertisement

6. Prepare to check the test operation with S-NET measurement instrument.
The system air conditioner can be checked with a computer. Connect S-NET measurement instrument before the test
operation as following figure.
G Install the S-NET program to the computer.
G Connect a RS-485 converter with COM1 or COM2 port of computer.
G Connect the communication wire connected with converter to F1,F2 terminal.
• Connect the communication wire with (TX+:F1),(TX-:F2) on connecting.
Samsung Electronics
(COM1/COM2)
Power
Port
Power
connecter
Reference Information
Outdoor Communication wire
10-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents