Superior Radiant Premier VS-VH Installation, Operation And Maintenance Instructions

Advertisement

Quick Links

Premier VS-VH
Infrared Heating System
Installation, Operation and Maintenance Instructions
FOR YOUR SAFETY
!
If you smell gas:
1. Open windows
2. Don't touch electrical switches
3. Extinguish any open flame
4. Immediately call your gas supplier
FOR YOUR SAFETY
!
Do not store or use gasoline or other
flammable vapors and liquids in the
vicinity of this or any other appliance.
Read and thoroughly understand these instructions & the System Design Layout
Improper installation, adjustment, alteration, service or maintenance can cause injury, death or
property damage. Read the installation, operating and maintenance instructions thoroughly before
Une installation, un réglage, une modification, une réparation ou un entretien incorrect peut entraîner
des dommages matériels, des blessures ou la mort. Lisez attentivement les instructions d'installation,
de fonctionnement et d'entretien avant de procéder à l'installation ou à l'entretien de cet équipement.
Superior Radiant Products
563 Barton Street, Stoney Creek, Ontario L8E 5S1
www.superiorradiant.com
Installer
before attempting any installation.
Owner
Retain this manual for reference.
WARNING
!
installing or servicing this equipment.
AVERTISSEMENT
!
CONSIGNES DE SEURITE
!
Si vous sentez une odeur de gaz:
1. Ouvrez les fenêtres
2. Ne touchez pas aux
interrupteursélectriques
3. Éteigneztouteflamme nue
4. Contactez immédiatement votre
fournisseur de gaz
CONSIGNES DE SEURITE
!
Il est interdit d'utiliser des liquides
inflammables ou dégageant des vapeurs
inflammables, a proximités de tout
appareil fonctionnent au gaz.
th
April 10
2015 - LT135

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Premier VS-VH and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Superior Radiant Premier VS-VH

  • Page 1 Premier VS-VH Infrared Heating System Installation, Operation and Maintenance Instructions   FOR YOUR SAFETY CONSIGNES DE SEURITE Si vous sentez une odeur de gaz: If you smell gas: 1. Ouvrez les fenêtres 2. Ne touchez pas aux 1. Open windows interrupteursélectriques...
  • Page 2 CAUTION: FIRE OR EXPLOSION HAZARD Maintain clearance to combustible constructions as further specified in this manual. Failure to do so could result in a serious fire hazard. Heaters should not be located in hazardous atmospheres containing flammable vapors or combustible dusts. Signs should be provided in storage areas specifying maximum safe stacking height and safe parking locations for vehicles of various heights.
  • Page 3: Table Of Contents

    TABLE OF CONTENTS INTRODUCTION ............................. 4 Operating Principle ............................4 APPLICABLE CODES ..........................5 General Installation and Gas Codes ......................5 Aircraft Hangar Installation .......................... 5 Public Garage Installation ..........................5 Parking Structures ............................5 Gas Supply Lines ............................5 Electrical ...............................
  • Page 4: Introduction

    INTRODUCTION Superior Radiant Products is a company in the infrared heating industry founded on the principles of product quality and consumer commitment. Quality commitment is evidenced by superior design, a regard for design detail and an upgrade of materials wherever justifiable.
  • Page 5: Applicable Codes

    PropaneInstallation Code,CAN/CGA B149.1 and B149.2 in Canada for proper location, sizing and installation of vents as well as information on termination clearance requirements when penetrating combustible walls for venting purposes. Premier VS-VH Infrared Heating System Page 5 April 10 , 2015...
  • Page 6: Equipment Specifications

    EQUIPMENT SPECIFICATIONS System Layout Types Figure 1: Symmetric System Overview Premier VS-VH Infrared Heating System Page 6 April 10 , 2015...
  • Page 7 EQUIPMENT SPECIFICATIONS Figure 2: Non-Symmetric System Overview Premier VS-VH Infrared Heating System Page 7 April 10 , 2015...
  • Page 8: Major Components

    Vacuum Switch 12" (30.5 cm) Ø 6" Ø 4" (10.2cm) (15.2cm) or 5" (12.7cm) 7.4" (18.8 cm) Damper Coupling Reducer w/Vacuum Switch 4" (10.2cm) Ø or 5" (12.7cm) Ø Premier VS-VH Infrared Heating System Page 8 April 10 , 2015...
  • Page 9 Tube Elbow, 5" (12.7cm) Ø Hanger Strap, 4" or 5" Ø (tailpipe) *A list of parts &part numbers can be found in the PARTS section at the end of this manual. Premier VS-VH Infrared Heating System Page 9 April 10...
  • Page 10: Burners

    4” type C duct for flue adaptor and outside air (optional) provided at the heater. Figure 5: Burner Dimensions 14.75 7.11 (37.5) (18.1) 7.18 (18.2) 9.48 (24.1) Air Flow Direction 17.06 (43.3) Dimensions: Inches (centimeters) Weight: 25 lbs (11.4kg) Premier VS-VH Infrared Heating System Page 10 April 10 , 2015...
  • Page 11 EQUIPMENT SPECIFICATIONS Figure 6 : Locations of Burner Labels /Stickers Premier VS-VH Infrared Heating System Page 11 April 10 , 2015...
  • Page 12: Wiring Diagram

    Pour utilization avec gaz naturel ou propane. Pour changer d un combustible a l autre, vous été requisz de prendre une trousse fournie par le fabricant. Linstallation doit etre fait par des personnes qualifiees seulement. UL007 Premier VS-VH Infrared Heating System Page 12 April 10 , 2015...
  • Page 13 VS-VH06 VS-VH10 VS-VH12 (in. wc) 120,000 20,000 40,000 60,000 80,000 100,000 110,000 12,000 24,000 36,000 48,000 60,000 66,000 Orifice size Superior Radiant Products Ltd. Stoney Creek, ON VL015 02/10 Premier VS-VH Infrared Heating System Page 13 April 10 , 2015...
  • Page 14 BURNER No. *As-Built* - if Burner will not be placed in this Position the Air Plates will need to be changed prior to installation, consult manual for further details. Premier VS-VH Infrared Heating System Page 14 April 10 , 2015...
  • Page 15 Use of approved Bottom Shield reduces C by up to 25%. Downstream 25 ft. from Burner: B, C, D can be reduced by up to 50%. (See Manual for Complete Details) VL016 02/10 Premier VS-VH Infrared Heating System Page 15 April 10 , 2015...
  • Page 16: Vacuum Pump A

    : 6” dia. Inlet & 4” dia. Outlet Tube Connection Figure 7: Vacuum Pump A - Available in RH or LH Style Dimensions: Inches (centimeters) Weight: 100 lb (45.5kg) (Including connecting pieces) Premier VS-VH Infrared Heating System Page 16 April 10 , 2015...
  • Page 17: Vacuum Pump B

    : 6” dia. Inlet & 6” dia. Outlet Tube Connection Figure 8: Vacuum Pump B - Available in RH or LH Style Dimensions: Inches (centimeters) Weight: 115 lbs (52.3kg) (Including connecting pieces) Premier VS-VH Infrared Heating System Page 17 April 10 , 2015...
  • Page 18: Clearance To Combustibles

    Reduced clearances downstream from the burner are approved for all configurations. Dimensions “B”, “C”, and “D” in Table Acan be reduced for locations 25 ft (7.6 m) or more downstream from a burner, before the next burner, maximum reduction is 50% Premier VS-VH Infrared Heating System Page 18 April 10...
  • Page 19 CLEARANCE TO COMBUSTIBLES Table A: Required Clearance to Combustibles *Clearance to combustibles for non-reflectored fittings is 18” (0.5 m). PREMIER VS-VH Burner Model # Dimensions: Inches (cm) Reflector Configurations VH02 VH04 VH06 VH08 VH10 VH12 (5.1) (5.1) (5.1) (5.1) (5.1) (10.2) (38.1) (38.1) (43.2) (58.4) (71.1) (76.2)
  • Page 20: Installation

    PREMIER VS-VH12 40 (12.2) 50 (15.3) 70 (21.4) 3 (0.9) 20 (6.1) & 120 000 *When minimum Radiant Tube lengths are used, minimum tailpipe length must be increased by 50% Premier VS-VH Infrared Heating System Page 20 April 10 , 2015...
  • Page 21 OR 3 - If result is ≤ 40' remaining, multiply by 0.75 for Minimum common Tailpipe Length 3) When using 5" Ø Tailpipe, the required Tailpipe lengths may be reduced by 25%. Premier VS-VH Infrared Heating System Page 21 April 10...
  • Page 22: Assembly Overview Notes

    Assembly Overview Notes Generally there is no unique sequence for installation of the Premier VS-VH system. A review of the job site will often indicate a logical installation order. However, it is typical to start at the end of the branch with the furthest burner location and continue that branch downstream towards the Vacuum Pump, then begin again with the next branch.
  • Page 23: Part 1 - Radiant Line System

    NOTE: Close all open ended “S” hooks and turnbuckles to avoid unhooking chain with inadvertent contact. NOTE: The Premier VS-VH System does not typically require the use of Baffles, if Baffles are desired please consult with the Manufacturer (SRP) prior to installation.
  • Page 24 INSTALLATION – PART 1 Figure 9: Radiant Line System – Component Relationships Premier VS-VH Infrared Heating System Page 24 April 10 , 2015...
  • Page 25 Make sure 1/4" hole is in the 12 o'clock position relative to the Combustion Tube and Burner, then secure to the Tube with a screw. #8 x 3/8" Screw End Vent Cap VS107 Premier VS-VH Infrared Heating System Page 25 April 10 , 2015...
  • Page 26 Reflector is installed. Tighten band clamps alternately to prevent buckling of the sleeve, set to Torque shown. Ensure that the weld seams on ALL Tubes are facing down. Figure 13: Tube Coupling Installation CR005 (SS) or CR010 Premier VS-VH Infrared Heating System Page 26 April 10 , 2015...
  • Page 27 INSTALLATION -PART 1 Figure 14 : View of System after Installation of Radiant Line Tubes System is now ready for Burner installation(s). Premier VS-VH Infrared Heating System Page 27 April 10 , 2015...
  • Page 28: B - Tailpipetubes

    ¼” per 10 ft (7 mm per 3 m) towards the Vacuum Pump location. System is now ready for Vacuum Pump and Ventilation connection(s). Premier VS-VH Infrared Heating System Page 28 April 10...
  • Page 29: C - Burners

    Burner to Hanger Combustion Tube Each Burner in a Premier VS-VH Branch must be placed in its appropriate position, and have the appropriate Air Plate installed. Burner Position No.1 is at the furthest end of the branch from the Vacuum Pump and the Burner number increases as the branch runs towards the Vacuum Pump.
  • Page 30 PREMIER VS-VH04 VS088 VS089 VS090 VS091 PREMIER VS-VH06 VS092 VS093 VS094 VS095 PREMIER VS-VH08 VS096 VS097 VS098 VS099 PREMIER VS-VH10 VS100 VS101 VS102 VS103 PREMIER VS-VH12 VS104 VS105 VS106 Premier VS-VH Infrared Heating System Page 30 April 10 , 2015...
  • Page 31 INSTALLATION – PART 1 Figure 18: Air Plate Change-Out Procedure Premier VS-VH Infrared Heating System Page 31 April 10 , 2015...
  • Page 32 Burners are now ready for Optional Combustion Air Supply connection(s) as necessary. Burners are now ready for Electrical System connection(s). Burners are now ready for Gas Supply System connection(s). Premier VS-VH Infrared Heating System Page 32 April 10 , 2015...
  • Page 33 INSTALLATION – PART 1 Figure 20 : View of System after Installation of Burners Premier VS-VH Infrared Heating System Page 33 April 10 , 2015...
  • Page 34: D - Reflectors

    Secure Bracket with supplied #8-32 x 1-1/4" screws and tighten firmly where required. Reflector End Cap CR002 Reflector Spring Clip CR001 CR024 (set) Reflector Bracket Premier VS-VH Infrared Heating System Page 34 April 10 , 2015...
  • Page 35 INSTALLATION – PART 1 Figure 22 : View of System after Installation of first Reflector Premier VS-VH Infrared Heating System Page 35 April 10 , 2015...
  • Page 36 *When using the optional Corner / Mitered Reflectors refer to Figure 27 in Section E- Optional Shield Equipment, for details on how to assemble Reflectors sections instead of installing End Caps. Premier VS-VH Infrared Heating System Page 36 April 10...
  • Page 37 INSTALLATION – PART 1 Figure 24 : View of System after Installation all Reflectors Premier VS-VH Infrared Heating System Page 37 April 10 , 2015...
  • Page 38: E - Optional Shield Equipment

    Burner Reflector sections to. Overlap the Burner Reflectors with Standard Reflectors; secure the Reflectors together with Support Brackets. Refer to the sequence of images in Figure 26 for more detail. Premier VS-VH Infrared Heating System Page 38 April 10...
  • Page 39 Finished Overlap with main Reflectors and secure Secure the second each in-place with one Burner Reflector Section Bracket and 2 Screws on top of the Base Premier VS-VH Infrared Heating System Page 39 April 10 , 2015...
  • Page 40 3/8” screws spaced about 18” (0.5 m) apart. Install three (3) Side Reflector Brackets per Side Reflector, spaced about 48” (1.2 m) apart, using #8 x 3/8” screws. DO NOT tighten screws where Reflectors overlap. Refer to Figure 28 on the following page for details. Premier VS-VH Infrared Heating System Page 40 April 10...
  • Page 41 CR035 Side Reflector Side Reflector Bracket CR019 CR016 Screws to be installed from inside of Side Reflector. Install screws on one end of the Retainer Clip to allow movement. Premier VS-VH Infrared Heating System Page 41 April 10 , 2015...
  • Page 42: F - Deco-Grille Option

    Reflector or as part of a T-bar installation where the Heater System is above the ceiling structure.Refer to Figure 29 and Figure 30 below for their respective details. Figure 29: Deco-Grille – Mounted Directly To Heater Premier VS-VH Infrared Heating System Page 42 April 10...
  • Page 43 INSTALLATION – PART 1 Figure 30: Deco-Grille – Mounted With T-Bar Premier VS-VH Infrared Heating System Page 43 April 10 , 2015...
  • Page 44: Part 2 - Vacuum Pump & Venting

    No fuel gas can flow or ignition begin before the vacuum proving switch has established the presence of a blower induced vacuum. See the “Electrical Connections” section for details on wiring the switch. Premier VS-VH Infrared Heating System Page 44 April 10...
  • Page 45: A - Vacuum Pump Mounting

    See Figure 31, Figure 32or Figure 33 respectively for mounting type details. Figure 31: Column Mounting – Recommended Pump Suspension Mount bracket to column with suitable fasteners. Isolators Mounting Kit VH010 Premier VS-VH Infrared Heating System Page 45 April 10 , 2015...
  • Page 46 200 lbs. (91 kg) is recommended for mounting vacuum pumps only. When suspending from ceiling, add threaded rod to prevent horizontal movement of pump. Isolators Mounting Kit VH010 Premier VS-VH Infrared Heating System Page 46 April 10 , 2015...
  • Page 47 INSTALLATION - PART 2 Venting The Premier VS-VH System is approved for both Sidewall (Horizontal) and Roof (Vertical) Venting. (Refer to Figure 34and Figure 35) General Requirements Venting must comply with the National Fuel Gas Code, ANSI Z223.1/ NFPA-54 in the USA and CAN/CGA B149.1/B149.2 Installation Code in Canada.
  • Page 48 For specific part numbers of wall vent connection pieces see Figure 34 OR the listing in the PARTS section of this manual. Vertical Venting:  For Vertical Venting refer to ANSI Z223.1 and CAN/CGA B149.1 for Fan Assisted Appliances. Premier VS-VH Infrared Heating System Page 48 April 10 , 2015...
  • Page 49: B - Venting Connections

    Figure 35: Ceiling Mounting - Recommended Venting (Vertical) Rain Cap Approved Thimble Flashing (If Necessary) Fasten To Ceiling Bolts FOR VERTICAL VENTING REFER TO ANSI Z223.1 AND CAN/CGA B149.1 AND B149.2 FOR FAN ASSISTED APPLIANCES. Premier VS-VH Infrared Heating System Page 49 April 10 , 2015...
  • Page 50: C - Additional Pump Connections & Equipment

    Neutralization Device is installed as required. Figure 37: Condensate Drain Detail - Optional 6" to 4" Reducer w/ Vacuum Switch VE007 VH004 Condensate Trap VH004 Premier VS-VH Infrared Heating System Page 50 April 10 , 2015...
  • Page 51: Part 3 - Optional Combustion Air Supply

    Outside Air Dampers* from Blower Directly to Outside or to Common Ductwork from Blower Flex Duct 12" Min. for all Flex Ducts Note: DO NOT Remove End Vent Cap Premier VS-VH Infrared Heating System Page 51 April 10 , 2015...
  • Page 52: Part 4 - Gas Supply System

     Gas Flex Line Connector must be ½” dia. x 36” (90 cm) long Installation or repair of this heater should only be done by personnel qualified for the installation of powered gas appliances. (Certified by the local or national regulating body) Premier VS-VH Infrared Heating System Page 52 April 10 , 2015...
  • Page 53: A - Flexible Gas Connector Line

    CONNECTOR MUST BE INSTALLED IN " " CONFIGURATION. USE ONLY THE 36" (90 cm) LONG CONNECTION OF " OR " (12.7 OR 19 mm) NOMINAL ID THAT WAS FURNISHED WITH THIS HEATER. Premier VS-VH Infrared Heating System Page 53 April10th,2015...
  • Page 54: Part 5 - Electrical Connections

    - Remote / Local control of Burner Power & Vacuum Pump(and optional Modulating Dampers) with options for various Thermostat status change response types. *Refer to their respective OEM Manual when electrically wiring ALL Control Devices Premier VS-VH Infrared Heating System Page 54 April10th,2015...
  • Page 55: A - Burners

    Any repair / replacement of the manufacturer’s wiring must have a minimum temperature rating of at least 105C and supply circuit wiring shall have a minimum size of 18 AWG. Figure 41: Burner Wiring Diagram Premier VS-VH Infrared Heating System Page 55 April10th,2015...
  • Page 56: B - Fresh Air Blower Interlock

    Supply Voltage 115V, 60 HZ, 15 A White White 1 PH. Fresh Air Blower 115 VAC, 1/3 HP BROWN (2) WIRE - USE WIRE NUT TO AVOID GROUNDING & EXPOSURE OF LIVE WIRE Premier VS-VH Infrared Heating System Page 56 April10th,2015...
  • Page 57: C - System Wiring Connections

    WARNING - DO NOT OPERATE THE VACUUM PUMP WHEN NOT INSTALLED - Unguarded openings can entangle clothing and severe injury can result - Unrestricted air flow into Vacuum Pump can cause the motor to overload Premier VS-VH Infrared Heating System Page 57 April10th,2015...
  • Page 58 VS Burners Part # (Maximum of 6) VE007 1 PH. Vacuum Pump Motor OR 3PH. Motor Starter BROWN (2) WIRE White - USE WIRE NUT TO AVOID GROUNDING & EXPOSURE OF LIVE WIRE Premier VS-VH Infrared Heating System Page 58 April10th,2015...
  • Page 59 INSTALLATION - PART 5 Figure 44: Single Zones with one 24V Burner Relay - Wiring Diagram Premier VS-VH Infrared Heating System Page 59 April10th,2015...
  • Page 60 INSTALLATION - PART 5 Figure 45: Two Zones with Two Thermostats and 24 V Burner Relay- Wiring Diagram Premier VS-VH Infrared Heating System Page 60 April10th,2015...
  • Page 61 INSTALLATION - PART 5 Figure 46: Two Zones with Two Thermostats with 120V Transformer- Wiring Diagram Premier VS-VH Infrared Heating System Page 61 April10th,2015...
  • Page 62 VS Burners- Zone # 2 * This is ONE possible set-up for the Control Panel, other set-ups are available, see OEM Instructions and / or your SRP Representative for more details. Premier VS-VH Infrared Heating System Page 62 April10th,2015...
  • Page 63 * This is ONE possible set-up for the SRP ControlPanel with a Variable Frequency Drive (VFD), other set-ups are available, see OEM Instructions and / or your SRP Representative for more details. NOTE: VFD is used for a single speed motor control only Premier VS-VH Infrared Heating System Page 63 April10th,2015...
  • Page 64 * This is ONE possible set-up for the SRP ControlPanel with a Variable Frequency Drive (VFD), other set-ups are available, see OEM Instructions and / or your SRP Representative for more details. Premier VS-VH Infrared Heating System Page 64 April10th,2015...
  • Page 65: Commissioning

    Figure 40 and Figure 39.  Purge Gas Lines of all air.  Verify the Wiring & that the Electrical Power Supply is connected but remains turned OFF. Premier VS-VH Infrared Heating System Page 65 April10th,2015...
  • Page 66: Part 2 -Initial System Power Test

    Vacuum Pump should turn on and after the pre-purge time, the Burners in that Zone should attempt to light. 5. Troubleshoot as necessary to get the System operational. (See the Trouble-Shooting section of this manual for more detailed information & helpful notes.) Premier VS-VH Infrared Heating System Page 66 April10th,2015...
  • Page 67: Part 3 -Balancing The System Vacuum

    COMMISSIONING Part 3 -Balancing the System Vacuum NOTE: The Premier VS-VH burner is a variable rate appliance. Vacuum Pump setting must be accurately adjusted to ensure Burners are operating at the specified design input. 1. Turn ON the Electrical Supply but NOT the Gas Supply (remains turned OFF).
  • Page 68 [in. W.C.] Rate [BTU/hr] per Branch Size 20,000 PREMIER VS-VH02 12,000 40,000 PREMIER VS-VH04 24,000 60,000 PREMIER VS-VH06 36,000 80,000 PREMIER VS-VH08 48,000 100,000 PREMIER VS-VH10 60,000 120,000 PREMIER VS-VH12 110,000 66,000 Premier VS-VH Infrared Heating System Page 68 April10th,2015...
  • Page 69: Operation

    3. A post purge cycle can be provided when a Control Panel is supplied. 4. System remains ‘OFF’ until ambient temperature falls below the Thermostat(s) setting. 5. System cycles through Steps 1 to 10 on a continuous basis until Power is turned OFF. Premier VS-VH Infrared Heating System Page 69 April10th,2015...
  • Page 70: Maintenance& Trouble-Shooting

    For VS Air Filter includes frame (Bulk Qty. 20) use part No. VH001B For VS Filter Media Kits (Bulk Qty 24) use part No. VH053B (Overall System maintenance requirements are found on the next page.) Premier VS-VH Infrared Heating System Page 70 April10th,2015...
  • Page 71 6. There should be no sound of leaking air around any of the various gaskets or connections. 7. Make spot checks of the interior of the Radiant Line Tubes for soot or obstructions, clean as required. Premier VS-VH Infrared Heating System Page 71...
  • Page 72 Burner Does Not Stay Lit 1. Check sensor wire for continuity. 2. Measure flame signal current, it should be above 5 A - DC. 3. Regulator adjustment may be necessary. 4. Ensure Filter is not obstructed. Premier VS-VH Infrared Heating System Page 72 April10th,2015...
  • Page 73: Parts

    BURNER MOUNTING GASKET VH004 MOUNTING U-BOLTS CE036 SENSE WIRE CE006 IGNITION WIRE (13 INCH) VE002 ELECTRODE ASSEMBLY VH005 ELECTRODE ASSEMBLY GASKET CH011 FLAME SIGHT WINDOW VG025 BURNER HEAD ASSEMBLY (ELECTRODE & GASKETS INCLUDED) Premier VS-VH Infrared Heating System Page 73 April10th,2015...
  • Page 74 CT011 VENT TERMINAL 4" - Exterior Wall Flue (Pump A) CT044 VENT TERMINAL 6" - Exterior Wall Flue (Pump B) CS006 WALL THIMBLE 4" (Pump A) CS033 WALL THIMBLE 6" (Pump B) Premier VS-VH Infrared Heating System Page 74 April10th,2015...
  • Page 75 PARTS Table K: Burner Part Numbers Part No. Description VH02N-1 PREMIER VS-VH BURNER 20,000 BTU NAT VH02N-2 PREMIER VS-VH BURNER 20,000 BTU NAT VH02N-3 PREMIER VS-VH BURNER 20,000 BTU NAT VH02N-4 PREMIER VS-VH BURNER 20,000 BTU NAT VH04N-1 PREMIER VS-VH BURNER 40,000 BTU NAT...
  • Page 76 TEE, 4" SQUARE COATED INSIDE CS059 DECO GRILLE SIDE SHIELD CT037 TEE, 4" SQUARE COATED INSIDE & OUT CS027 T-BAR SHIELD MODULATING SYSTEM COMPONENTS VT013 MOTORIZED DAMPER 4" Dia. VT014 MOTORIZED DAMPER 5" Dia. Premier VS-VH Infrared Heating System Page 76 April10th,2015...
  • Page 77: Warranty

    THE REMEDIES PROVIDED FOR IN THE ABOVE EXPRESS WARRANTIES ARE THE SOLE AND EXCLUSIVE REMEDIES. NO OTHER EXPRESS OR IMPLIED WARRANTIES ARE MADE INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. Premier VS-VH Infrared Heating System Page 77 April10th,2015...