Superior Radiant LA-40 Installation, Operation And Service Instructions

Series la/lx/lxr

Advertisement

Series LA/LX/LXR Infrared Heater
Installation, Operation and Service Instructions
FOR YOUR SAFETY
If you smell gas:
1. Open windows
2. Don't touch electrical switches
3. Extinguish any open flame
4. Immediately call your gas supplier
CONSIGNES DE SECURITE
Si vous sentez une odeur de gaz:
1. Ouvrez les fenetres
2. Ne touchez pas aux interupteurs
electriques
3. Eteignez tout flamme nue
4. Contactez immediatment votre
fournisseur de gaz
Read and thoroughly understand these Instructions before attempting any installation.
Improper installation, adjustment, alteration, service or maintenance can cause injury, death or property
damage. Read the installation, operation and service instructions thoroughly before installing or servicing
Series LA/LX/LXR
Installer
Owner
Retain this Manual for reference.
WARNING
this equipment.
563Barton Street, Stoney Creek, Ontario L8E 5S1
www.superiorradiant.com
FOR YOUR SAFETY
Do not store or use gasoline or other
flammable vapors and liquids in the
vicinity of this or any other appliance.
CONSIGNES DE SECURITE
Il est interdit d'utiliser des liquides
inflammables ou degageant des vapeurs
inflammables, a proximites de tout appareil
fonctionnent au gaz.
Page 1
Feb 11th 2015
LT016

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LA-40 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Superior Radiant LA-40

  • Page 1 Series LA/LX/LXR Infrared Heater Installation, Operation and Service Instructions FOR YOUR SAFETY FOR YOUR SAFETY If you smell gas: Do not store or use gasoline or other 1. Open windows 2. Don’t touch electrical switches flammable vapors and liquids in the vicinity of this or any other appliance.
  • Page 2 CAUTION: FIRE OR EXPLOSION HAZARD Maintain clearance to combustible constructions as further specified in this manual. Failure to do so could result in a serious fire hazard. Heaters should not be located in hazardous atmospheres containing flammable vapors or combustible dusts. Signs should be provided in storage areas specifying maximum safe stacking height.
  • Page 3: Table Of Contents

    Table of Content INTRODUCTION ..................................4 ..................................4 NSTALLATION ODES General Installation and Gas Codes ............................4 Aircraft Hangar Installation ..............................4 Public Garage Installation ..............................4 Parking Structures................................. 4 Gas Supply Lines ................................... 5 Electrical ....................................5 Venting ....................................5 GENERAL SPECIFICATIONS ..............................
  • Page 4: Introduction

    Superior Radiant offers its 15 years of infrared expertise in a cost effective unitary heater design as culmination of that commitment. Series LA/LX/LXR models are field assembled, low intensity infrared heaters that are easy to install and maintain, and which were engineered with significant input from our customers.
  • Page 5: Gas Supply Lines

    Introduction Gas Supply Lines Gas supply pipe sizing must be in accordance with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada. A 1/8" inch NPT plugged tap must be installed in the gas line connection immediately upstream of the burner farthest from the gas supply meter to allow checking of system gas pressure.
  • Page 6: General Specifications

    General Specifications General Specifications Gas Supply Inlet Pressure Natural Gas: Minimum 5.0" W.C. Propane Gas: Minimum 11.5" W.C. Maximum 14.0" W.C. Maximum 14.0" W.C. Manifold Pressure Natural Gas: 3.5" W.C. Propane Gas: 10.5" W.C. Inlet Connection Natural Gas or Propane: 1/2" female NPT Electric Supply 120 VAC, 60 HZ, 1 Amp: 36"cord with grounded 3 prong plug Flue and Outside Air Connection...
  • Page 7: Dimensional Charts

    Dimensional Charts 18" 6" 16" 24" 14" 36" 12" 15" 12" 10' - 4" 9" Figure 1:Overall Dimensional Information ELBOW BAFFLE SECTION 16" WHEN INSTALLING, ORIENT BAND CLAMP LOCK BOLTS TO TOP, AT 10 O'CLOCK OR 2 O'CLOCK POSITION 4', 6' OR 8' COUPLING REFLECTOR 12"...
  • Page 8: Configurations

    Configurations Heat Exchanger Length High Rate Baffle (ft.) Model (BTU/Hr) Length (ft.) Minimum Maximum LA/LX/LXR-40 40,000 LA/LX/LXR-60 60,000 LA/LX/LXR-80 80,000 Three 4’ lengths LA/LX/LXR-100 100,000 Table 1: Configuration Information Note: Baffles are always placed in the last section of radiant tube except for the 100,000 BTU Burner. Baffles are either aluminized or stainless steel sections 6' long.
  • Page 9 Series 750 Configurations The following special configurations are also approved to comply with NFPA 30 A and NFPA 54 where maximum tube temperature is below 750°F. 30 ft. or 40 ft. with 12 ft. baffle (2 – 6 ft sections, 1aluminized and 1 stainless). The 60,000 BTU/Hr first 3 tubes (30 ft.) are black coated.
  • Page 10: Clearance To Combustibles

    Clearance to Combustibles A general clearance of 18” (0.5 m) in every direction is recommended for servicing only around each Burner, Vacuum Pump, and End Vent Cap air supply (at the far end of each Radiant Branch) also to ensure adequate air flow in and around the Heating System. In addition to this it is very important to observe the minimum clearance to combustibles at all times to avoid any possibility of property damage or personal injury.
  • Page 11 Clearance to Combustibles Table 2: Minimum Clearance to Combustibles Model No.: LA/LX/LXR Reflector Configurations Horizontal 2" 2" 2" 2" 4" 4" 4" 6" 31" 31" 31" 36" 4" 4" 4" 6" 45° Reflector Tilt 3" 3" 3" 4" 3" 3" 3"...
  • Page 12: Installation

    Installation Installation Sequence Generally, there is no unique sequence for installation of the burner or heat exchanger. A review of the job site will usually indicate a logical installation order. However, time and expense can be saved if installation is begun at the most critical dimension, watching for interference from overhead doors, cranes, auto lifts etc.
  • Page 13 Installation Figure 5: Installation Configuration for 80,000 BTU Model Series LA/LX/LXR Page 13 Feb 11th 2015...
  • Page 14 Installation Figure 6: Installation Configuration for 80,000 BTU Model Series LA/LX/LXR Page 14 Feb 11th 2015...
  • Page 15 Installation A general ordered sequence for installation is provided below for reference. Reflector End Cap Reflector Overlap Approx. 8" Loose Screws Fasten Endcap Tight with Screws Screws Vent Adapter Loose Screws Bend Tab Tight over End Screws of Tube **Install Baffle(s) as required Close all chain links in the last section of tube or "S"...
  • Page 16 Installation Truss I-Beam Concrete Beam I-Beam Eye Bolt 12" Anchor Min. Beam Clamp 24" Min. Note: 12" Close all "S" hooks, 3/8" Min. chain links, "J" bolts Threaded and turnbuckles or any open connection. Turnbuckle Chain link Figure 8: Suspension Mechanism ...
  • Page 17 Installation NSTALLATION  Always use all the hangers supplied. As a rule the combustion tube (first tube) utilizes 2 hangers and thereafter 1 hanger per 10' section. It is required that the first hanging point be 2" to 8" from the burner mounting flange, and tube weld seam must face down, refer to Figure 10for more details.
  • Page 18 Installation  Tighten the cradle loops of the first hanger with the “J-Bolt” found in the burner box, to snugly hold the combustion tube from rotating see Figure 12. Note: For all coupling joints, ensure that the tube joint is in the center of the coupling length, and that the overlap joint of the coupling is above the centerline of the tube.
  • Page 19 Installation EATER AND AFFLE NSTALLATION  Locate the burner gasket provided, bolt the burner in place on the tube flange with provided hardware. Burner must never be installed in a tilted position. The sense electrode of the burner cup should be in the 12 o’clock position (Figure 13). Note: Tube Burner MUST NEVER be...
  • Page 20 Installation  A general overall view of the tubes and reflector hangers are shown inFigure 15 below Locate Tube and Reflector Hangers every 10' thereafter. 10' Tube *Note: (30' system shown Vent here, the same principle Adapter should be followed for 40', 50' systems or more) Bend Tab Refer to Installation Sequence...
  • Page 21 Installation EFLECTOR NSTALLATION  Slide a reflector section into place within the support hanger, (Figure 16). Slide Reflector through the Hanger and Reflector Support as shown. Note: Close all chain links "S" hooks, "J" bolts and turnbuckles or any open connection. Figure 16: Reflector Installation ...
  • Page 22 Installation Note:Reflectors should overlap adjacent reflectors 4" to 6". Be sure not to tile reflector sections; that is, reflector sections must be either above both adjacent reflector sections, or below both adjacent reflector sections. Refer toFigure 18. Vent Termination Reflector Reflector Overlap Support Approx.
  • Page 23 Installation  Secure every second reflector overlap together with a minimum of 2 - #8 x 3/8" long screws (not supplied), and secure reflector to the reflector bracket at this point by tightening down #8 x 1¼" screws supplied with reflector brackets (Figure 19). The remaining reflector overlapjoints and reflector brackets are left loose to accommodate system movement.
  • Page 24 Installation “U-T ” I LBOW AND NSTALLATION  If required by the heater layout, install 90° elbows or U-tube where indicated. Refer to Figure 21 for details. Note: Elbows or U-tubesare typically installed without reflectors. To reduce the above clearance to combustibles distance use miter reflectors (see Figure 22) and refer to Clearance to Combustibles information.
  • Page 25 Installation ITERED EFLECTOR NSTALLATION  If used, install the Mitered Reflector as shown below (Figure 22). Assemble Corner Bracket to Mitered Reflectors as shown Fasten Mitered Reflectors with 4 - #8 x 3/8" Screws Mitered Reflector Sections should overlap standard Reflectors.
  • Page 26 Installation & B EFLECTORS OTTOM HIELDS  If used, install side shields (reflectors) and/or bottom shield as required. Refer to Figure 23andFigure 24for details.  Side shields are 124" long. Fasten one side shield per reflector with #8 x 3/8" screws. Use three side shield brackets per side shield.
  • Page 27 Installation OTTOM HIELD EFLECTOR NSTALLATION  Bottom shields need not overlap. Each 5' section is held with two support brackets (see Figure 24). Note: Close all open ended "S" hooks, chain links, and turnbuckles or any open connection. Tighten Screw Tubing Section #8 x 3/8"...
  • Page 28 Installation RILLE PTIONAL Series LA/LX/LXR heaters are approved for the addition of Deco-Grille either directly to the heater reflector or as part of a T-Bar installation where the heater is above the ceiling structure. Refer to Figure 25 and Figure 26 below for details. Deco-Grille Panel Note: Close all open ended "S"...
  • Page 29: Venting / Combustion Air Ducting

    Venting / Combustion Air Ducting General Requirements  Refer to the National Fuel Gas Code, ANSI Z223.1 (NFPA 54) in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada, as well as all local requirements for general venting guidance.
  • Page 30: Vented Operation

    Venting / Combustion Air Ducting Vented Operation In all cases, be sure vent pipes and outside air supply ducts are sealed with approved sealant, such as high temperature RTV silicone. Double wall venting (B vent) may not require sealant. Horizontal Venting ...
  • Page 31: Common Horizontal Venting

    Venting / Combustion Air Ducting SINGLE HEATER MULTIPLE HEATERS FOR VERTICAL VENTING REFER TO ANSI Z223.1 AND CAN/CGA B149.1 FOR VERTICAL VENTING REFER TO AND B149.2 FOR FAN ASSISTED ANSI Z223.1 AND CAN/CGA B149.1 APPLIANCES. AND B149.2 FOR FAN ASSISTED TYPE B-VENT APPLIANCES.
  • Page 32: Combustion Air Supply (Optional)

    Venting / Combustion Air Ducting Combustion Air Supply (Optional)  An outside combustion air supply is strongly recommended if the building space encloses a negative pressure due to exhaust etc. or if the building contains materials which would expose the heater to halogenated hydrocarbon atmospheres.
  • Page 33: Outdoor Installation

    Outdoor Installation (LXR M UTDOOR NSTALLATION ODELS When a heater is to be mounted outdoors it must be installed in such a way that wind will have minimum effect on its movement. This consideration is intended to eliminate undue stress on the gas flex connector. In all cases a fresh air hood must be used in conjunction with a vent terminal of the approved type, and all connections must be sealed with a high temperature sealant that can withstand 400°F.
  • Page 34: Gas Piping

    Gas Piping General Requirements  The gas meter and service must be sufficiently large to supply gas to the connected building gas load including the heating equipment and any other gas fired equipment. Additionally, the gas distribution piping must be designed according to local and national ordinances. Generally (low pressure) systems designed with a maximum ½"W.C.
  • Page 35: Electrical Wiring

    Electrical Wiring General Requirements Heaters are normally controlled by line voltage (120V) or low voltage (24V) thermostats. Line voltage thermostats are wired directly while low voltage thermostats use a relay. In all cases, heaters must be grounded in accordance with the National Electric Code, ANSI/NFPA 70 in the US, and the Canadian Electric Code, CSA C22.1 in Canada, and must comply with all local requirements.
  • Page 36: Lxr Wiring Only

    Electrical Wiring LXR Wiring Only The following wiring diagram is for LXR models only THERMOSTAT IS MOUNTED EXTERNALLY Blue & Purple Wires are Factory Jumpered, 24V STAT Disconnect to Wire in Thermostat Purple SWITCH Channel Module 53X-24 Blue Purple Yellow Brown BLOWER Green...
  • Page 37: Burner Operation

    Burner Operation Starting Sequence of Operation  Turn the thermostat up. When the thermostat calls for heat, the blower motor will energize.  When the motor approaches nominal running RPM, the air-proving switch closes and activates the ignition module.  The ignition module, after a pre-purge period of approximately 30 seconds, energizes the igniter. Additionally, the gas valve is energized for this ignition trial period of 15 seconds.
  • Page 38: Troubleshooting

    Troubleshooting Blower Motor Fails to Run  Is the thermostat calling for heat? Is there 115V at the burner receptacle?  Check blower side door for seal. Repair as necessary.  Check blower for obstructions. Replace blower if necessary. No Gas Supply ...
  • Page 39: Troubleshooting Chart

    Troubleshooting Chart Troubleshooting Chart Series LA/LX/LXR Page 39 Feb 11th 2015...
  • Page 40: Replacement Parts

    Replacement Parts ITEM # PART # DESCRIPTION ITEM # PART # DESCRIPTION CE057 INDICATOR LIGHT CE006 IGNITION WIRE CE015 IGNITION MODULE LG004 BURNER CUP BURNER CUP ASSEMBLY (C/W ELECTRODES) CG142 GAS VALVE REPLACEMENT KIT - NAT. LG005 CG143 GAS VALVE REPLACEMENT KIT - LPG. CH011 SIGHT GLASS ASSEMBLY CE058...
  • Page 41: Warranty

    Warranty SERIES LA, LX, and LXR INFRARED HEATERS WARRANTY The manufacturer warrants to the original owner that the product will be free of defects in material and workmanship as described below. Warranty Period Series Component Years Years Years Years Burner & Controls Hot Rolled Heat Exchanger w/o Post Purge Aluminized Heat Exchanger w/o Post Purge Hot Rolled Heat Exchanger with Post Purge...

Table of Contents