Levelling total
station measuring
NA720/724/728/730/730 plus, Operation
008802_001
Wanted:
Position of several ground points.
The levelling total station measuring is normally carried out during area level-
ling.
Procedure:
Step Description
1.
Sequence of measurements is the same as with area levelling. However,
beside the height read also the staff section L (see chapter "Distance meas-
uring") and the Hz-angle.
2.
Transfer measured value into the map - points are determined by position
and height.
Backsight to known point
35