Installation sequence
Mounting the boiler and making connections
Removing the front panel and mounting the boiler
3.
2.
1.
2x
1. Undo screws at the bottom of the
3. Hook the boiler onto the wall mount-
boiler; do not remove completely.
ing bracket.
2. Remove front panel.
12