Installation Sequence Siting And Levelling The Boiler; Removing The Front Panel - Viessmann Vitocrossal 100 Installation Instructions For Contractors

Gas condensing boiler with matrix cylinder burner open flue and room sealed operation fully pre-assembled and wired
Table of Contents

Advertisement

Siting and levelling the boiler
Note
A suitable condensate drain must be available in the
installation room if the boiler is installed at ground level
(max. 50 mm above the floor).
Fig. 4

Removing the front panel

The front panel has to be removed to fit the gas supply
pipe, as well as the room sealed set and neutralising
system (accessories).
2.
1.
3.
Fig. 5
±15mm
Extend the adjustable feet until the castors are free of
load.
Level the boiler with its adjustable feet.
Note
If a neutralising system is being fitted, wind out the
adjustable feet as far as possible.
Note
Special foundations are not required.
1. Tip the front panel forward slightly at the top.
2. Undo the locking screws until the front panel can
be removed.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ci1

Table of Contents